We were asked by this client to improve the existing scheme by adding a standout club house to their remodelling of an existing equestrian centre. Our designed proposed a much better use of space and light, by adding a loft level and double height space for a cafe and break-out area. This scheme has achieved planning and is currently in Stage 4 - Technical Design


